IBE Group constructed new barriers for Newman Institutional Project to improve the visibility of the safety zone for the pedestrians and protect them.
Some residential projects needs to be demolished and rebuilt it part by part in order to make its foundation solid and keep its unique design.
IBE Group constructed new barriers for Newman Institutional Project to improve the visibility of the safety zone for the pedestrians and protect them.
Some residential projects needs to be demolished part by part and rebuilt it part by part in order to make its foundation solid and keep its unique design.
The floor coverings in the common areas has been removed and new floor tiles placed.
Maimonides Geriatric Center’s bathrooms has been modified to serve our senior citizens much better.
The floor coverings in the common areas has been removed and new floor tiles placed.
Maimonides Geriatric Center’s bathrooms has been modified to serve our senior citizens much better.
Félix-Leclerc Secondary School’s sanitary blocks and changing rooms needed to be renovated. We changed the old parts with news and fixed the roof.
Champlain project has a lot of work to do in different areas, such as drilling on the soil, excavation, armature cage installation, setting of sonotubes and pouring the concrete into it, asphalt paving and etc.
Félix-Leclerc Secondary School’s sanitary blocks and changing rooms needed to be renovated. We changed the old parts with news and fixed the roof.
Champlain project has a lot of work to do in different areas, such as drilling on the soil, excavation, armature cage installation, setting of sonotubes and pouring the concrete into it, asphalt paving and etc.
The adult education center’s old staircases and awnings were in a bad condition. IBE Group renovated all these outdoor elements and made the center ready to serve again.
UQAM was a huge institutional project requiring all its showersto be changed. As a general contractor IBE Group successfully concluded in a limited time.
The adult education center’s old staircases and awnings were in a bad condition. IBE Group renovated all these outdoor elements and made the center ready to serve again.
UQAM was a huge institutional project requiring all its showersto be changed. As a general contractor IBE Group successfully concluded in a limited time.